Dedusting installations
The list of plants where dust reduction systems have been installed with the application of water mist:
- EC „Kraków” S.A. – gradual provision of Dustex system for consecutive coal feed conveyor belts.
- KGHM HM “Głogów II” S.A. – transport of fluxing agents from the drying plant to the furnace.
- El. Skawina S.A. – the first biomass chute.
- JSW KWK „Borynia” – chutes and sieves for coal transport.
- PKE S.A. El. Łaziska – biomass chutes.
- EC “Kraków” S.A. – biomass chutes.
- Porphyry Mine “Zalas” Krzeszowice – aggregate sorting plant.
- Nordkalk sp. z o.o. Aggregate Mine “Miedzianka” – aggregate loading.
- EC Będzin S.A. – biomass chutes.
- PGE El. Turów S.A. – biomass chutes, phase 1
- El. Kozienice S.A. – biomass chutes, phase 1
- PGE El. Opole S.A. – biomass chutes in Building 12
- PGE El. Opole S.A. – chutes with biofuel in Building 10
- PGE El. Opole S.A. – biomass loading node
- Dalkia Łódź S.A. EC-4 – ash loading on vehicles
- Dalkia Łódź S.A. EC-4 – chutes with biofuel
- PGE El. “Dolna Odra” – chutes with biofuel
- VHP EC Siekierki Warszawa – chutes with biomass
- EDF El. Rybnik S.A. – chutes with biofuel to loading bunkers
- VHP EC Siekierki Warszawa – extension of the existing installation onto the entire coal feed system
- EDF EC Wrocław – chutes at stations S3, S4, S5 i S6.
- El. Kozienice S.A. – biomass chutes, phase 2
- EDF EC Kraków S.A. – chutes of TN9 conveyor belt
- PGE El. Turów S.A. – biomass chutes, phase 2
- EDF EC Kraków – modernisation of the existing system on belts TN5A,B and TN6A,B
- KGHM O/ZG Polkowice-Sieroszowice – dusting reduction at the salt warehouse